Lowell Stine |
Construction Option |
2013-2014 |
|
Library In Metropolitan Washington D.C. |
Technical Assignments |
|
|
|
|
Technical Assignment I |
|
To view and/or download a PDF of the Technical Assignment I click the Tech. I picture above. |
|
|
|
Technical Assignment II |
|
To view and/or download a PDF of the Technical Assignment II click the Tech. II picture above. |
|
|
|
Technical Assignment III |
|
To view and/or download a PDF of the Technical Assignment III click the Tech. III picture above. |
|
|
|
User Note: While great efforts have been taken to provide accurate and complete information on the
pages of CPEP, please be aware that the information contained herewith is considered a work in in progress
for this thesis project. Modifications and changes related to the original building designs and
construction methodologies for this senior thesis project are solely the interpretation of Lowell Stine. Changes and discrepancies in no way imply that the original design contained errors or was
flawed. Differing assumptions, code references, requirements, and methodologies have been
incorporated into this thesis project; therefore, investigation results may vary from the original
design. |
|
|
This page was last updated on 12/16/2013, by Lowell Stine and is hosted by the AE Department
©2013
|
|